Skip to Main content Skip to Navigation
Journal articles

Due-window assignment and scheduling with multiple rate modifying activities under the effects of deterioration and learning

Abstract : This paper discusses due-window assignment and scheduling with multiple rate-modifying activities. Multiple types of rate-modifying activities are allowed to perform on a single machine. The learning effect and job deterioration are also integrated concurrently into the problem which makes the problem more realistic. The objective is to find jointly the optimal location to perform multiple rate-modifying activities, the optimal job sequence, and the optimal location and size of the due window to minimize the total earliness, tardiness, and due-window-related costs. We propose polynomial time algorithms for all the cases of the problem under study.
Document type :
Journal articles
Complete list of metadatas

https://hal.archives-ouvertes.fr/hal-00653663
Contributor : Frédéric Davesne <>
Submitted on : Monday, December 19, 2011 - 11:39:29 PM
Last modification on : Tuesday, June 30, 2020 - 11:56:07 AM

Links full text

Identifiers

Collections

Citation

Zhanguo Zhu, Linyan Sun, Feng Chu, Ming Liu. Due-window assignment and scheduling with multiple rate modifying activities under the effects of deterioration and learning. Mathematical Problems in Engineering, Hindawi Publishing Corporation, 2011, pp.151563. ⟨10.1155/2011/151563⟩. ⟨hal-00653663⟩

Share

Metrics

Record views

128