Skip to Main content Skip to Navigation
Conference papers

Bi-Objective Optimization for an Integrated Facility Location and Disassembly Line Balancing Problem

Abstract : As an essential step during product recovery, disassembly has gained widespread attention with the growing awareness of sustainable development, and various problems around disassembly have been investigated. This paper integrates the facility location and disassembly line balancing problem to minimize the total cost as well as minimize the cycle time of the disassembly line. For the studied problem, a bi-objective mixed-integer programming model is formulated. Based on the problem properties, an epsilon-constraint method is proposed to solve the studied problem. Numerical experiments on an illustrative example and benchmark instances are conducted to demonstrate our proposed model and method.
Document type :
Conference papers
Complete list of metadata

https://hal-univ-evry.archives-ouvertes.fr/hal-03723059
Contributor : Frédéric Davesne Connect in order to contact the contributor
Submitted on : Wednesday, July 13, 2022 - 10:36:12 PM
Last modification on : Friday, July 15, 2022 - 3:23:32 AM

Identifiers

  • HAL Id : hal-03723059, version 1

Citation

Peng Hu, Feng Chu. Bi-Objective Optimization for an Integrated Facility Location and Disassembly Line Balancing Problem. 10th IFAC Conference on Manufacturing Modelling, Management and Control (MIM 2022), Jun 2022, Nantes, France. ⟨hal-03723059⟩

Share

Metrics

Record views

0